Step 1: Site consultation and estimate
We visit your property to measure the area, assess drainage, note access challenges, and discuss how you plan to use the space. Pets? Kids? Pool area? Putting green? This shapes turf selection and base design.
You receive a written estimate with itemized costs for turf, base materials, labor, and any drainage work. No hidden fees or vague "price per foot" quotes.
Step 2: HOA submittal (if applicable)
For HOA communities, we provide product samples, cut sheets, and installation details for your architectural review. Many Orange County HOAs now approve quality turf with proper documentation.
Wait for written HOA approval before scheduling installation. We can help prepare your submittal package.
Step 3: Demolition and excavation
We remove existing grass, irrigations lines (or cap them), and excavate to the required depth — typically 3–4 inches for compacted base material. Soil is hauled away; we leave your site clean.
This step takes 1–2 days for most residential yards depending on size and access.
Step 4: Base preparation
Compacted aggregate base is the foundation of a long-lasting installation. We spread, grade for drainage, and compact crushed rock in layers. Proper compaction prevents settling, pooling, and weed growth.
Base prep is where cheap installations cut corners. A solid base adds a day to the timeline but is essential for performance.
Step 5: Turf installation and finishing
Turf rolls are positioned, seamed, and secured at edges. Seams are glued and sometimes nailed to prevent separation. Perimeter edging keeps turf tight against hardscape, fences, and planting beds.
Infill is spread and brushed into the turf to support fibers, improve drainage, and add weight. We groom the turf so fibers stand upright for a natural appearance.
Step 6: Final walkthrough
We walk the finished installation with you, point out seams and edges, demonstrate drainage, and provide care instructions. You receive documentation including warranty terms and our contact information.
Most residential installations complete in 1–3 days after base prep, depending on yard size and complexity.
